33 Patty, Kasia, Adam, Nora Check In 01OCT2024
Date: October 1, 2024
Attendees:
- Nora Pearson
- Patty Burns
- Kasia Ulanowski
- Adam Devlin
33.1 Site Selection Discussion
33.1.1 Current Approach
- Selection Criteria
- Based on existing soil survey maps
- At least one sample per mapped component in each park with multiple descriptions for larger map units
- Consideration of park size and number of map units
- Avoiding redundant sampling of same series (e.g., Chetek)
- Future Considerations
- Potential to incorporate parent material-based selection
- Discussion needed with Randy about LA approach
- Interest in reviewing historical land use patterns
- Need to address spatial gaps in current sampling
33.1.2 Site Coverage Discussion
- Current Gaps
- Central Saint Paul area (primarily residential)
- Need to balance between parks and residential areas
- Parks often show industrial site conversion history
- Importance of residential sites for minor components
- Value of Park Sampling
- Finding significant human-transported materials
- Evidence of historical land use
- Examples from recent sites:
- Trout Brook (former railroad site)
- Swede Hollow (artifacts and dense materials)
33.2 Field Work Planning
33.2.1 Upcoming Schedule
- October 5-6
- Como Park sampling
- Thursday and Friday
- Large team (6-7 people)
- Residential sites planned for Friday
- Nora to join Friday (8:30 AM start)
- Future Sites
- Phalen Lake (14 points planned)
- Raspberry Island pending
- Additional NRCS soil scientists joining for October
33.2.2 Scheduling Notes
- Adam and Kasia at Soils and Landscapes training next week
- Field work scheduled for October 22-25
- Two additional soil scientists recruited for October work
33.3 Administrative Updates
33.3.1 Survey123 Access
- Account Setup Status
- Adam’s account active
- Kasia and Patty accounts pending
- Nic to create accounts during next meeting - need work/home addresses for account creation
33.3.2 Randy Meeting Planning
- Schedule Coordination
- Randy unavailable week of October 14-18
- Looking at bimonthly meetings
- Topics to include:
- Anthropic epipedons discussion
- Site selection methodology
- General project guidance
- Timing Options
- Mondays: 8-11:30 AM or 1-3 PM
- Working around field work schedule
- Aiming for week of October 21
33.4 DSP Project Planning
33.4.1 Action Items
- Immediate Needs
- Nic/Nora to draft 2-paragraph project synopsis
- Framework needed for NASIS entry
- Timeline: Initial draft by end of week if possible
- Final submission target: October/November
- Development Process
- Framework can evolve as project develops
- Need to align with DSP policy and protocols
- Shaunna provided workbook guidance
- Joe requesting initial concept outline
33.5 Action Items
33.5.1 Immediate (This Week)
- Nic/Nora
- Draft DSP project synopsis
- Complete Survey123 account creation
- Follow up regarding Randy meeting scheduling
- Adam/Kasia
- Update Google Calendar with detailed field work plans
- Coordinate Como Park sampling logistics
- Review Phalen Lake sampling points
- Patty
- Coordinate with Randy for meeting scheduling
- Continue DSP framework development
- Follow up on Survey123 access
33.5.2 Longer Term
- Team
- Develop more structured site selection approach
- Plan winter work priorities
- Consider additional residential sampling strategy
33.6 Next Meetings
- Como Park field work: October 5-6
- Randy meeting: TBD (targeting week of October 21)
- Regular bimonthly meetings to be scheduled
33.7 Notes
- Field season wrapping up this month/early November due to weather, shifting focus to winter planning and documentation