32 Patty and Nora Check-in 10SEP2024
Date: September 10, 2024
Attendees: Nora Pearson, Patty Burns
32.1 Field Work Planning & Updates
32.1.1 Next Two Weeks Schedule
- Week of September 12
- Thursday afternoon (Sept 12):
- Nora and Adam to sample at Marydale Park
- Planning 2 profile descriptions out of 4 proposed sites
- Time: 12:00 PM - 4:00 PM
- Thursday afternoon (Sept 12):
- Week of September 16
- Wednesday and Thursday (Sept 18-19):
- Adam and Patty to sample at Swede Hollow
- Nora may join Thursday afternoon
- 3 primary sampling points identified with 2 backup locations
- Gopher One tickets to be submitted by Nora
- Wednesday and Thursday (Sept 18-19):
32.1.2 Sweet Hollow Site Details
- Location: Near downtown St. Paul, adjacent to Bruce Vento Nature Sanctuary
- Site characteristics:
- Previously sampled in 2022 for depth-based incremental sampling
- Known for high lead concentrations
- Contains artifacts and course fragments
- May have auger refusal issues around 50cm depth
- Team advised to bring shovels and additional equipment
- Important note: Team should avoid Bruce Vento Nature Sanctuary and Indian Mounds Regional Park due to cultural significance and burial sites (not included on permit)
32.1.3 Week of September 23
- Nora will be in Kansas for soil judging contest
- Patty will be up north for appointments
- Adam and Kasia to coordinate field work independently
- Regular Tuesday meeting (Sept 24) likely canceled
32.2 Administrative Updates
32.2.1 Field Work Coordination
- Planning Strategy
- Aim to maintain 2-3 weeks of advance planning
- Adam and Kasia to coordinate teams through shared Google Calendar
- Patty to be contacted directly for availability
- Documentation
- Detailed site documents created for each location including:
- Sampling points
- Parking information
- Navigation notes
- Site-specific considerations
- Documents serve dual purpose for team use and permit applications
- Detailed site documents created for each location including:
- Gopher One Tickets
- Currently handled by Nora
- Plan to train Adam on submission process during Sept 12 field work
- Timing considerations for flag placement and removal
32.3 Project Updates
32.3.1 NRCS Updates
- Patty working on:
- NASA’s project review with Randy, Dan, and Joe
- Preparing to enter DSP into NASA
- Awaiting Randy’s trip report for documentation
32.3.2 Schedule Notes
- Regular Tuesday meetings moved to 10:30 AM
- Team adjusting to new meeting time
- Flexibility needed for scheduling around field work and other commitments
32.4 Action Items
32.4.1 Immediate (This Week)
- Nora
- Submit Gopher One tickets for Sweet Hollow sampling (Sept 18-19)
- Coordinate with Adam regarding Thursday’s (Sept 12) Marydale Park sampling
- Train Adam on Gopher One ticket submission process
- Patty
- Review and provide Randy’s trip report when available
- Coordinate with Adam for Sweet Hollow sampling next week
32.4.2 Future Items
- Team
- Maintain 2-3 week advance planning for field work
- Coordinate sampling equipment and logistics
- Plan around September schedule disruptions (soil judging competition, appointments)
32.5 Next Meetings
- Regular weekly meeting: Tuesday, September 17, 10:30 AM
- Field work: September 12 (Marydale Park)
- Field work: September 18-19 (Swede Hollow)
- Week of September 23: Coordination to be handled by Adam and Kasia
32.6 Notes
- Previous sampling data from 2022 will be valuable for comparison with new profile descriptions
- Equipment considerations important for sites with known sampling challenges
- Coordination between university and NRCS teams working effectively through current system