33 Nic, Patty, Adam, Nora Check In 17SEP2024
Date: September 17, 2024
Attendees:
- Nicolas Jelinski
- Nora Pearson
- Patty Burns
- Adam Devlin
33.1 Meeting Structure Updates
33.1.1 Future Meeting Schedule
- Moving to biweekly meetings starting October 1st
- Maintaining current time (10:30 AM Tuesdays)
- Nic and Nora absent next week (September 24) due to soil judging competition
- Additional meetings can be scheduled as needed
33.2 Field Work Planning
33.2.1 Week of September 17
- Marydale Park
- Pending Gopher One clearance (St. Paul Parks response pending)
- Adam and Nora to coordinate regarding equipment transfer
- Swede Hollow Park (September 18)
- Meeting time: 8:00 AM
- Patty driving in from out of town
- 3 primary sampling points with 2 backup locations
- Site notes:
- One main parking lot
- Some stairs involved
- Historic area with documented artifacts
- Trout Brook Nature Sanctuary (September 19)
- Two different entrance points provided: Jenks Avenue entrance and Jackson Street entrance (main)
- Nora to join in afternoon
- 3 sampling points identified
33.3 Technical Updates
33.3.1 Survey123 Access
- Account Setup Progress
- Successfully created university account for Adam
- Access confirmed for web and mobile versions
- Duo authentication setup completed
- Features available: View all sampling points, access to profile descriptions, photo documentation, data export capabilities
- Next Steps
- Create accounts for:
- Patty
- Kasia
- Potentially Joe and Dan
- Cost: $25 per sponsored account (chargeable to project)
- Create accounts for:
33.3.2 Documentation Requirements
- Field Data Collection
- GPS locations required
- Profile photos
- Description sheets
- Site videos
- All materials to be uploaded to: Survey123, Google Drive (lab shared drive)
- Site Documentation
- Addresses and coordinates provided in Google Calendar
- Detailed site information in shared documents
- Backup paper copies available if needed
33.4 Administrative Updates
33.4.1 NASA’s Project Status
- Patty completing inventory project
- Few minor tables remaining
- DSP project planning:
- Consulting with Shaunna regarding newest user guide
- Planning discussions with Nic for workbook completion
- Winter timeline for detailed development
33.4.2 Gopher One Training
- Session planned for Adam
- Tentative date: Friday at 11:00 AM
- Alternative date to be scheduled after soil judging if needed
- Nora to continue submissions in interim
33.5 Action Items
33.5.1 Immediate (This Week)
- Nic
- Set up additional Survey123 accounts
- Nora
- Coordinate equipment transfer with Adam
- Update calendar invites for biweekly schedule
- Make Nic co-host for future meetings
- Adam
- Test Survey123 mobile access
- Update calendar availability for new meeting schedule
- Coordinate with Patty for field work logistics
- Patty
- Continue NASA’s project documentation
- Prepare DSP discussion points for October meetings
33.6 Schedule Notes
33.6.1 Upcoming Absences
- Week of September 23:
- Nic and Nora at Kansas soil judging competition
- Patty in northern MN
- Field work to be coordinated by Adam and Kasia
33.6.2 Next Meetings
- September 24: Canceled
- October 1: First biweekly meeting
- Format: Same Zoom link (pending confirmation)
33.7 Additional Notes
- Field work timing considerations for heat
- Equipment and supply coordination ongoing
- Documentation systems working effectively
- Team adapting well to new coordination structure